Construction of a ventilated facade, i.e. installation of an aluminium grid, installation of mineral wool thermal insulation and installation of trapezoidal corrugated metal sheets.
Roof area: 4.000 m2
Completion of work: March 2017
Comprehensive construction of the roofing of school buildings, i.e. double-layer roofing with weldable roofing paper and flashings.
Roof area: 4.000 m2
Completion of work: July 2017
Comprehensive construction of the hall's roofing, i.e. trapezoidal corrugated metal sheets, thermal insulation, double-layer roofing with weldable roofing paper and flashings.
Roof area: 3.500 m2
Completion of work: July 2018
Comprehensive construction of the hall's roofing, i.e. trapezoidal corrugated metal sheets, thermal insulation, roofing membrane with flashings, and guttering.
Roof area: 3500 m2
Completion of work: July 2018
Comprehensive construction of the hall's roofing, i.e. trapezoidal corrugated metal sheets, thermal insulation, roofing membrane with flashings.
Roof area: 1100 m2
Complete roof renovation: covering with weldable roofing paper together with thermal insulation and installation of skylights.
Roof area: 1300 m2
Area of skylights: 700 m2
Roof installation: roof covering with weldable roofing paper and cladding with trapezoidal corrugated metal sheets.
Roof area: 1000 m2
Cladding: 400 m2
Construction structure: 43 tons of steel
Cladding made of sandwich panels and roof installation:
installation of trapezoidal corrugated metal sheets
installation of PIER foam thermal insulation
installation of roof membranes
Roof area: 1000 m2
Installation of a roof and hall cladding made of trapezoidal corrugated metal sheets.
Roof area: 2000 m2
Wall cladding: 3.000 m2
Construction of a roofing with wieldable roofing paper together with polystyrene thermal insulation.
Roof area: 1600 m2
Comprehensive renovation of the R-110kV switching station building in SE Połaniec included tearing off the old roofing, repairing the roofing with levelling mortar, protecting the roof against flooding, laying 2 layers of weldable roofing paper, installing new flashings, replacing the guttering of drain pipes with coated steel gutters, cleaning and painting the protective barriers, hatches and ladders.
Roof area: 2000 m2
Completion of work: September 10, 2019